AN INVESTIGATION INTO RISK MANAGEMENT PRACTICES AMONGST QUANTITY SURVEYORS IN THE NIGERIAN CONSTRUCTION INDUSTRY

Project Information:

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 80 ::   Attributes: Questionnaire, Data Analysis ::   3,935 people found this useful

Project Body:

CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND OF THE STUDY

Quantity surveying is concerned with controlling and managing construction projects.The Nigerian construction industry is faced with uncertainties. With construction targets not being met and high rate of abandoned construction projects, there is great need for proper risk assessment and implementation. Managing risks in construction projects havebeen recognized as a very important process in order to achieve project objectives in termsof time, cost, quality, safety and environmental sustainability (Mills, 2001). Project risk managementis an iterative process: the process is beneficial when is implemented in a systematic mannerthroughout the lifecycle of a construction project, from the planning stage to completion.

 

Risk management has become an integral process in managing construction projects. Construction project activities are to be well calculated in-order for the deliverable to be of great use and benefit to its stakeholders. To complete most construction projects on time, minimizing cost and wastages proper risk management techniques must be employed (Tchankova, 2002). According to Mills (2001), systematic riskmanagement is expecting the unexpected or in other words it is a tool which helpscontrol risks in construction projects and its objective is to introduce a simple, practicalmethod of identifying, assessing, monitoring and managing risk in an informed andstructured way.

Normally, in risk management process, the first steps will involves risk identificationprocess which includes the prioritization process in order to identify and rank the riskbased on its impact and seriousness. Risk that will have a greater impact on a projectnormally will be handled first and low impact risk will be handled later.

Construction project team consist of professional such as the architect, engineer, and thequantity surveyor that will help to assist and advice the client in order to meet all theproject objectives in term of time, quality and cost. Awareness and knowledge on riskmanagement is very crucial so that they will deal with the risk properly which willdirectly leads to project success. Due to this scenario, this research aims to identify thelevel of awareness of construction professional specifically Nigerian quantitysurveyors towards risk management. Apart from that, it will also aim to identify howrisk management being implemented in the Nigerian construction industry and also thepotential barrier and challengers in the implementation of risk management specificallyfrom the quantity surveyor's point of view.

 

1.2 STATEMENT OF THE PROBLEM

Embarking on a construction project involves taking risks, as the Nigerian construction industry is not risk-free. No matter how small or simple is the projectit is still can go wrong as soon as the two parties, the employer and the contractor signeda contract they have taken onboard the risk (Sawczuk, 1996). The individual in theconstruction industries that undertake various activities are heterogeneous since client,consultant and contractors have different roles and objectives (flanagan, 1995). Riskmanagement in Nigerian construction industry is actually not widely being practiced.

According to Burchett (2009),Risk in construction, however cannot be eliminated, but itcan be minimized, transferred or retained. However, the industry has a very poorreputation for managing risk, with many projects failing to meet deadlines and costargents (Mills, 2001). In practice, normally in order to deal with the unexpected event,there will be an allocation about 10 percent from the estimated cost of the proposedconstruction project as a contingency sum. Earlier observation shows that the riskmanagement process is not widely being implemented in Nigerian constructionindustry. For this reason, this research seeks to identify the barriers and challenges forthe implementation of risk management in the Nigerian construction industry.

 

1.3 OBJECTIVES OF THE STUDY

The aim of this research is to investigate the practice of risk management amongstthe construction practitioners specifically the quantity surveyor in the Nigerian construction industry.

In order to achieve the aim of the study, specific objectives for the study are:

  1. To evaluate the quantity surveyor's level of awareness and acceptance onRisk Management practice.
  2. To identify the current practice of risk management amongst Quantity Surveyors’.
  3. To examine the barriers and challenges to the implementation of riskmanagement in construction project from the quantity surveyor's point ofview.

 

1.4 RESEARCH QUESTIONS

  1. What is the quantity surveyor's level of awareness and acceptance on Risk Management practice?
  2. What is the current practice of risk management amongst Quantity Surveyors’?
  3. What barriers and challenges face the implementation of risk management in construction project from the quantity surveyor's point of view?

 

1.5 RESEARCH HYPOTHESIS

  1. Ho: Awareness and acceptance of risk management practices do not aid quantity surveyors in attaining construction project objectives
  2. Hi: Awareness and acceptance of risk management practices aid quantity surveyors in attaining construction project objectives

 

1.6 SIGNIFICANCE OF THE STUDY

Findings of this study will aid Nigerian quantity surveyors in appreciating the importance of adopting proper risk management techniques in their daily jobs. Since risk management is not widely beingadopted in Nigerian construction industry, this research will help to promote thepractice of risk management among the industry's players.

In addition to this, being aninter-discipline type of research, both the consultants and contractors and also theindustry as a whole may benefit from the outcome of the research and have betterunderstanding on risk management.

 

1.7 SCOPE AND LIMITATION OF STUDY

This research study will focus on risk management practices adopted by quantity surveyors in Uyo Local Government area of Akwa Ibom State, Nigeria. All findings and recommendations from the study are limited to findings and recommendations based on the chosen sample size.

In carrying out this study, the researcher was faced with time and finance constraints, as lectures did not give room for more time to extend the research time frame. Finance on the other hand made printing, transportation to cover a wider area difficult.

 

1.8 DEFINITION OF TERMS

RISK- This is the potential of losing something of value, weighed against the potential to gain something of value.

RISK PERCEPTION-Risk perceptionis the subjective judgment people make about the severity of a risk, and may vary person to person

PRACTICE- is the act of rehearsing a behavior over and over, or engaging in an activity again and again, for the purpose of improving or mastering it, as in the phrase "practice makes perfect

QUANTITY SURVEYOR- aQuantity Surveyor (QS) is a professional working within the construction industry concerned with construction costs and contracts.

CONSTRUCTION- In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.

 

RISK MANAGEMNENT- is the identification, assessment, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability and/or impact of unfortunate eventsor to maximize the realization of opportunities.

 


Get The Complete Project »

Project Department:

MORE QUANTITY SURVEYING FREE UNDERGRADUATE PROJECT TOPICS AND RESEARCH MATERIALS

Instantly Share this Project On Social Media:

CLOSELY RELATED QUANTITY SURVEYING FREE UNDERGRADUATE PROJECT TOPICS AND RESEARCH MATERIALS

AN INVESTIGATION INTO RISK MANAGEMENT PRACTICES AMONGST QUANTITY SURVEYORS IN THE CONSTRUCTION INDUSTRY OF NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 67 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4724 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Quantity surveying is concerned with controlling and managing construction projects. The Nigerian construction industry is faced with uncertainti...Continue reading »

ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 71 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   3775 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Until relatively recently, the discipline of development appraisal has remained the provenance of surveyors and developers. It largely been ignor...Continue reading »

ASSESSMENT OF FACTORS AFFECTING CONTRACTORS TENDER FOR CONSTRUCTION PROJECTS IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4915 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Shash (1993) explains that a construction company can either negotiate with the client or use a competitive tendering process to obtain a contrac...Continue reading »

THE EFFECT OF MOTIVATION OF LABOUR, COST AND PRODUCTIVITY ON NIGERIAN CONSTRUCTION INDUSTRY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 74 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4010 engagements

CHAPTER ONE 1.1 BACKGROUND TO THE STUDY Human resource management is of strategic importance when it comes to industries that are labour intensive like construction industry. The effective management...Continue reading »

THE EFFECT OF TIMELY DELIVERY OF CONSTRUCTION PROJECTS ON THE ECONOMIC DEVELOPMENT OF NIGERIA ( A CASE STUDY OF SOME SELECTED PROJECT SUPERVISORS IN JULIUS BEGER PLC AND MARLUM CONSTRUCTION COMPANY)

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 70 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   3386 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and m...Continue reading »

THE IMPACT OF COST CONTROL TECHNIQUES ON CONSTRUCTION PROJECTS DELIVERY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 73 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   6705 engagements

CHAPTER ONE 1.1 BACKGROUND OF THE STUDY It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes l...Continue reading »

What are you looking for today?

TESTIMONIALS:

  • 1. Jayone from FPA said " I had a wonderful experience using UniProjectMaterials,though they did not deliver the material on time, but the content had good quality. I recommend UniProjectMaterials for any project research work.".
    Rating: Very Good
  • 2. Mugisha R from B.U, UGANDA said "Wow, this is great, your materials has helped me alot. Many blessings. I will inform my friends. Thanks. ".
    Rating: Very Good
  • 3. Nwachukwu Ruth Chinyerr from Michael okpara university of Agriculture,umudike said "I really appreciate this. Materials like this are good guides to writing a researchable project.".
    Rating: Good
  • 4. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 5. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 6. Mohammed A.B from Veterinary Laboratory, Zanzibar ,Tanzania said "You are doing good job to assists in research. God bless you.".
    Rating: Very Good

Paper Information

Format:ms word
Chapter:1-5
Pages:80
Attribute:Questionnaire, Data Analysis
Price:₦3,000
Get The Complete Project »

Best Selling Projects

Our Archives