CHAPTER ONE

INTRODUCTION

1.1 BACKGROUND OF THE STUDY

 Quantity surveying is concerned with controlling and managing construction projects. The Nigerian construction industry is faced with uncertainties. With construction targets not being met and high rate of abandoned construction projects, there is great need for proper risk assessment and implementation. Managing risks in construction projects have been recognized as a very important process in order to achieve project objectives in terms of time, cost, quality, safety and environmental sustainability (Mills, 2001). Project risk management is an iterative process: the process is beneficial when is implemented in a systematic manner throughout the lifecycle of a construction project, from the planning stage to completion.

Risk management has become an integral process in managing construction projects. Construction project activities are to be well calculated in-order for the deliverable to be of great use and benefit to its stakeholders. To complete most construction projects on time, minimizing cost and wastages proper risk management techniques must be employed (Tchankova, 2002). According to Mills (2001), systematic risk management is expecting the unexpected or in other words it is a tool which helps control risks in construction projects and its objective is to introduce a simple, practical method of identifying, assessing, monitoring and managing risk in an informed and structured way.

 Normally, in risk management process, the first steps will involves risk identification process which includes the prioritization process in order to identify and rank the risk based on its impact and seriousness. Risk that will have a greater impact on a project normally will be handled first and low impact risk will be handled later.

 Construction project team consist of professional such as the architect, engineer, and the quantity surveyor that will help to assist and advice the client in order to meet all the project objectives in term of time, quality and cost. Awareness and knowledge on risk management is very crucial so that they will deal with the risk properly which will directly leads to project success. Due to this scenario, this research aims to identify the level of awareness of construction professional specifically Nigerian quantity surveyors towards risk management. Apart from that, it will also aim to identify how risk management being implemented in the Nigerian construction industry and also the potential barrier and challengers in the implementation of risk management specifically from the quantity surveyor's point of view.

 

1.2 STATEMENT OF THE PROBLEM

 Embarking on a construction project involves taking risks, as the Nigerian construction industry is not risk-free. No matter how small or simple is the project it is still can go wrong as soon as the two parties, the employer and the contractor signed a contract they have taken onboard the risk (Sawczuk, 1996). The individual in the construction industries that undertake various activities are heterogeneous since client, consultant and contractors have different roles and objectives (flanagan, 1995). Risk management in Nigerian construction industry is actually not widely being practiced.

 According to Burchett (2009), Risk in construction, however cannot be eliminated, but it can be minimized, transferred or retained. However, the industry has a very poor reputation for managing risk, with many projects failing to meet deadlines and cost argents (Mills, 2001). In practice, normally in order to deal with the unexpected event, there will be an allocation about 10 percent from the estimated cost of the proposed construction project as a contingency sum. Earlier observation shows that the risk management process is not widely being implemented in Nigerian construction industry. For this reason, this research seeks to identify the barriers and challenges for the implementation of risk management in the Nigerian construction industry.

 

1.3 OBJECTIVES OF THE STUDY

 The aim of this research is to investigate the practice of risk management amongst the construction practitioners specifically the quantity surveyor in the Nigerian construction industry.

 In order to achieve the aim of the study, specific objectives for the study are:

To evaluate the quantity surveyor's level of awareness and acceptance on Risk Management practice.

To identify the current practice of risk management amongst Quantity Surveyors’.

To examine the barriers and challenges to the implementation of risk management in construction project from the quantity surveyor's point of view.

 

1.4 RESEARCH QUESTIONS

What is the quantity surveyor's level of awareness and acceptance on Risk Management practice?

What is the current practice of risk management amongst Quantity Surveyors’?

What barriers and challenges face the implementation of risk management in construction project from the quantity surveyor's point of view?

 

1.5 RESEARCH HYPOTHESIS

Ho: Awareness and acceptance of risk management practices do not aid quantity surveyors in attaining contruction project objectives

Hi: Awareness and acceptance of risk management practices aid quantity surveyors in attaining construction project objectives

 

1.6 SIGNIFICANCE OF THE STUDY

 Findings of this study will aid Nigerian quantity surveyors in appreciating the importance of adopting proper risk management techniques in their daily jobs. Since risk management is not widely being adopted in Nigerian construction industry, this research will help to promote the practice of risk management among the industry's players.

 In addition to this, being an inter-discipline type of research, both the consultants and contractors and also the industry as a whole may benefit from the outcome of the research and have better understanding on risk management.

 

1.7 SCOPE AND LIMITATION OF STUDY

 This research study will focus on risk management practices adopted by quantity surveyors in Uyo Local Government area of Akwa Ibom State, Nigeria. All findings and recommendations from the study are limited to findings and recommendations based on the chosen sample size.

 In carrying out this study, the researcher was faced with time and finance constraints, as lectures did not give room for more time to extend the research time frame. Finance on the other hand made printing, transportation to cover a wider area difficult.

 

1.8 DEFINITION OF TERMS

RISK- This is the potential of losing something of value, weighed against the potential to gain something of value.

RISK PERCEPTION- Risk perception is the subjective judgment people make about the severity of a risk, and may vary person to person

PRACTICE- is the act of rehearsing a behavior over and over, or engaging in an activity again and again, for the purpose of improving or mastering it, as in the phrase "practice makes perfect

QUANTITY SURVEYOR- a Quantity Surveyor (QS) is a professional working within the construction industry concerned with construction costs and contracts.

CONSTRUCTION- In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect.

RISK MANAGEMNENT- is the identification, assessment, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability and/or impact of unfortunate events or to maximize the realization of opportunities


Get The Complete Project »

Project Department:

MORE QUANTITY SURVEYING FREE UNDERGRADUATE PROJECT TOPICS AND RESEARCH MATERIALS

Instantly Share this Project On Social Media:

CLOSELY RELATED QUANTITY SURVEYING FREE UNDERGRADUATE PROJECT TOPICS AND RESEARCH MATERIALS

ANALYSIS OF THE IMPACT OF FEASIBILITY/VIABILITY STUDY ON CAPITAL PROJECT DEVELOPMENT IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 71 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   3809 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Until relatively recently, the discipline of development appraisal has remained the provenance of surveyors and developers. It largely been ignor...Continue reading »

ASSESSMENT OF FACTORS AFFECTING CONTRACTORS TENDER FOR CONSTRUCTION PROJECTS IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 75 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4931 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Shash (1993) explains that a construction company can either negotiate with the client or use a competitive tendering process to obtain a contrac...Continue reading »

THE EFFECT OF MOTIVATION OF LABOUR, COST AND PRODUCTIVITY ON NIGERIAN CONSTRUCTION INDUSTRY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 74 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4026 engagements

CHAPTER ONE 1.1 BACKGROUND TO THE STUDY Human resource management is of strategic importance when it comes to industries that are labour intensive like construction industry. The effective management...Continue reading »

THE EFFECT OF TIMELY DELIVERY OF CONSTRUCTION PROJECTS ON THE ECONOMIC DEVELOPMENT OF NIGERIA ( A CASE STUDY OF SOME SELECTED PROJECT SUPERVISORS IN JULIUS BEGER PLC AND MARLUM CONSTRUCTION COMPANY)

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 70 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   3405 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and m...Continue reading »

THE IMPACT OF COST CONTROL TECHNIQUES ON CONSTRUCTION PROJECTS DELIVERY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 73 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   6725 engagements

CHAPTER ONE 1.1 BACKGROUND OF THE STUDY It is a known fact that the Nigerian construction industry continues to occupy an important position in the nation’s economy even though it contributes l...Continue reading »

THE IMPACT OF PROCUREMENT SYSTEMS ON CONSTRUCTION COST AND DELIVERY

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 79 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4642 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY The construction industry is an importan t part of the economical backbone in many countries (Ngai et al., 2002), often accounting for between 7-...Continue reading »

What are you looking for today?

TESTIMONIALS:

  • 1. Jayone from FPA said " I had a wonderful experience using UniProjectMaterials,though they did not deliver the material on time, but the content had good quality. I recommend UniProjectMaterials for any project research work.".
    Rating: Very Good
  • 2. Mugisha R from B.U, UGANDA said "Wow, this is great, your materials has helped me alot. Many blessings. I will inform my friends. Thanks. ".
    Rating: Very Good
  • 3. Nwachukwu Ruth Chinyerr from Michael okpara university of Agriculture,umudike said "I really appreciate this. Materials like this are good guides to writing a researchable project.".
    Rating: Good
  • 4. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 5. Ibrahim Salama from Kaduna said "Thanks You So Much Sir We Appreciate ".
    Rating: Excellent
  • 6. Mohammed A.B from Veterinary Laboratory, Zanzibar ,Tanzania said "You are doing good job to assists in research. God bless you.".
    Rating: Very Good

Paper Information

Format:MS word
Chapter:1-5
Pages:67
Attribute:Questionnaire, Data Analysis,Abstract
Price:₦3,000
Get The Complete Project »

Best Selling Projects

Our Archives